Home / Industries
Semiconductor Parts for OSAT Plants, Equipment Makers and Fabs
Several kinds of buyer send drawings to shops in Vietnam. They buy different parts, on different schedules, with different paperwork, and the right shop for one is often wrong for the next.
Who buys, and what they buy
Say which of these you are in the RFQ. It narrows the shops faster than the part number does.
OSAT assembly and test plants
Plants in Vietnam that buy line hardware: jigs, change parts, carriers and fixtures, often on a short deadline and reordered on a fixed drawing.
Equipment makers and subsystem suppliers
Companies abroad that buy machined parts for the tool itself. Low quantity, a full document set and a first article before anything repeats.
Test and burn-in
Test floor and test hardware teams buying handler change kits, burn-in board hardware and socket adjacent parts, one device at a time.
Automation and line builders
Integrators building new lines in Vietnam who need frames, brackets, conveyor and pick and place parts made close to the site.
Spares and refurbishment
Teams keeping installed tools and lines running, who reorder wear parts and replace parts made to older drawings.
Electronics assembly next door
SMT and box build plants that share the same supply base: reflow carriers, wave solder pallets and test fixtures.
Parts each back end step consumes
Assembly and test is where most machined line hardware goes. Typical combinations, not a complete list, and your own drawings decide the material.
| Line step | Machined parts | Usual materials | How it is reordered |
|---|---|---|---|
| Wafer mount and saw | Cassette and frame handling parts, guides, brackets | A6061, SUS304, POM | Spares as parts wear |
| Die attach | Pick-up tools and collets, work holders, heater block parts, magazine parts | SKD11, SUS440C, ESD plastics | Change parts per package size |
| Wire bond | Heater blocks, window clamps, work holders | Tool steel, SUS, hardened inserts | Per lead frame or substrate design |
| Molding | Mold chase parts, cull and runner inserts, ejector parts | SKD61 and other hardened mold steels, often plated | Per package, through tooling shops |
| Trim, form and singulation | Punches, dies, guides, stripper plates | SKD11, carbide inserts | Wear parts reordered on a fixed drawing |
| Final test | Handler change kits, nests, plungers, contactor hardware | A6061, PEEK, PEI, ESD POM | Per device, often urgent |
| Burn-in | Board stiffeners, socket lids, frames and carriers | Aluminum, PEI, FR4 | Per board design |
| Pack and ship | Tray and reel tooling, guides, line brackets | POM, aluminum | Occasional |
Background on the back end itself: integrated circuit packaging. Guides by step: wire bond and die attach tooling, trim and form tooling, test handler change kits and burn-in board and socket parts.
Buying for a plant here or buying for export
The same shop can serve both. The order around the part is what changes.
For a plant in Vietnam
- Short delivery loop, repeat lots on a fixed drawing
- Price and delivery consistency weigh as much as tolerance
- Local invoice and delivery to the plant gate
- ESD handling, marking and lot control come up often
- Region matters, see the capacity guide
For export
- Incoterm, export documents and packing for the destination
- First article and a full document set before repeats
- NDA in place before files cross a border
- Cleanroom packing when the part goes to a tool or a fab
- See packing and shipping to a fab
What to put in the RFQ for your kind of work
A few lines that save a round of questions. The full list is in the RFQ template.
- Line hardwareAnnual quantity, how fast a repeat is needed, ESD and marking requirements, delivery address.
- Equipment partsFinish specification, cleanliness and packing, inspection scope, destination and Incoterm.
- Test hardwareDevice or package name if you can share it, the handler or socket it fits, and which features locate the device.
- Line buildingSize of the largest part, weldment or not, and the site where it is installed.
- SparesDrawing revision, a photo or sample if the drawing is old, and how many you reorder a year.
Questions about the parts we supply
Context on the investment behind the back end: what the buildout changes for parts buyers.
Do you only take OSAT line work?
No. We also supply machined parts for equipment makers and their subcontractors. Fewer shops here can take vacuum, chamber and gas hardware today, so for those parts the answer is sometimes one partner shop or a plain no.
Can the parts come from a shop close to my plant?
Location is one of the things we read on every RFQ. Say where the parts go and how often, and it is weighed against the capability the part needs. The regional guide explains what the region actually changes.
Do I need a company in Vietnam to buy?
No. Buyers abroad order from us and we ship the parts out of Vietnam with the export paperwork, so you do not need a local entity. Tell us the destination and we price freight and documents in the quote.
Who sees my drawing?
Partner shops first see a work request with part family, material, size, quantity, tolerance, finish, packing and destination. No name, no company, no files. Your drawing goes only to the partner shops we ask to price the part, up to 3, and only after an NDA if you ask for one.